Locally Designed and Engineered

A typical plans for permit project process.

Project analysis, review and quote. Documented scope of services and work agreement with fee schedule.

Site visit, measure and collect retainer.

DRAFTING, DESIGN AND ENGINEERING PROCESS

⦁ Research limitations and perimeters, correspond with city planners.

⦁ CAD drafted existing and proposed floor plans.

⦁ Space plan options with perimeters and requirements.

  • California Building Code 2026.

⦁ Drafted plans: site, existing and proposed.

⦁ Courtesy plan check with building department.

⦁ Drafted exterior elevations, sections, roof plans, electrical/plumb and details.

⦁ Coordinate plans with structural engineer (Lovelace Engineering).

⦁ Title 24 Report (Energy Analytical).

⦁ Assimilate plans pages architectural, structural, title 24 combined for a full set construction docs for submission for a building permit.

⦁ Revision process; two is normal.

⦁ Obtain building permit. Plan check and permit fees responsibility of project owner.

Meet the Team

  • B.K. Martin

    Architectural Designer, Founder

    www.bklmdesign.com

  • Lovelace Engineering

    Structural

  • Energy Analytica

    Title 24 / CALGreen

  • Christian Wheeler Engineering

    Soils Reports / Geotech Engineer

Let’s plan your project in detail!

Complete the form to inquire about how to make your vision real!